The Rules for the transmission system capacity allocation at Dravaszerdahely interconnection point in the binding phase of the Open Season procedure

Based on article 31 of Commission Regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 (hereinafter: CAM Regulation), Joint statement by Plinacro and FGSZ (sign: Class: PL-17/2694, File No. T/IP-17-2) of 26 July 2017 as well as the Decision by the Croatian Energy Regulatory Agency (Class: 310-34/17-03/03, File No. 371-03-17-07) of 26 July 2017 on providing consent on the proposal of the Rules for the transmission system capacity allocation at Dravaszerdahely interconnection point in the binding phase of the Open Season procedure, on 27 July 2017 Plinacro, as a transmission system operator, adopted
 
The Rules for the transmission system capacity allocation at Dravaszerdahely interconnection point in the binding phase of the Open Season procedure
 
The relevant Rules can be downloaded on the following link: the Rules